This material removal rate calculator works out how fast a machining operation removes metal, in cubic inches or cubic centimeters per minute. Enter the depth of cut, the width of cut and the feed rate, and the material removal rate calculator gives the MRR, the rate per hour and, if you enter a volume, how long it will take to remove it.
How to use the material removal rate calculator
- Choose US or metric units. US (inches and inches per minute) is the default.
- Enter the depth of cut and the width of cut.
- Enter the feed rate, the speed the tool or table moves.
- Enter a volume to remove if you want the cutting time, then press Calculate.
What is material removal rate?
Wikipedia defines material removal rate (MRR) as the volume of material removed per minute, typically measured in cubic centimeters per minute. It's a key measure of how productive a machining operation is: a higher MRR removes the stock faster, so the part is finished sooner, as long as the machine, tool and workpiece can handle it.
The MRR formula
According to Wikipedia, the material removal rate can be calculated as the depth of the cut times the width of the cut times the feed rate:
MRR = depth of cut × width of cut × feed rate
In US units, inches × inches × inches per minute gives cubic inches per minute. In metric, millimeters × millimeters × millimeters per minute gives cubic millimeters per minute, which the calculator divides by 1,000 to show cubic centimeters per minute.
Worked example
Take a milling pass with a 0.1-inch depth of cut, a 0.5-inch width of cut and a feed rate of 20 inches per minute. The MRR is 0.1 × 0.5 × 20 = 1 cubic inch per minute, about 16.4 cubic centimeters per minute, or 60 cubic inches per hour. Removing 5 cubic inches of stock at that rate takes 5 minutes of cutting.
In metric, a 2 mm depth, 10 mm width and 500 mm/min feed remove 2 × 10 × 500 = 10,000 cubic millimeters, or 10 cm³ per minute.
Reading the results
The big number is the material removal rate. The table shows it in the other unit and per hour, and the cutting time if you entered a volume to remove. The cutting time doesn't include moves between cuts, tool changes or setup.
Raising the removal rate
Because MRR is the product of three numbers, increasing any one of them raises it in proportion: doubling the feed rate doubles the MRR. In practice, each is limited. Deeper and wider cuts need more spindle power and a rigid setup, and higher feed rates load the cutting edges harder. Many shops balance them so the tool lasts and the surface finish stays acceptable.
Comparing strategies
Use the calculator to compare roughing strategies. A shallow, full-width cut and a deep, narrow cut can give the same MRR: 0.1 × 0.5 × 20 and 0.5 × 0.1 × 20 both remove 1 cubic inch per minute. Which works better depends on the tool, the machine and the material.
Milling, turning and other processes
The same idea applies to other processes, as long as you identify the depth, width and rate correctly. In milling, the feed rate is how fast the table moves. In turning on a lathe, the depth of cut is how far the tool goes into the radius, the width is the feed per revolution, and the rate is the cutting speed of the surface past the tool. Whatever the process, the result is the volume of material removed each minute.
Metric units
Choose metric to enter millimeters and millimeters per minute. The calculator shows the result in cubic centimeters per minute, the unit Wikipedia gives as typical, and converts it to cubic inches too. One cubic inch is about 16.39 cubic centimeters.
Estimating job time
To estimate how long roughing a part will take, work out the volume of stock to remove, the difference between the raw block and the finished shape, and enter it as the volume. The calculator divides it by the MRR to give the cutting time. Add time for finishing passes, tool changes and moves between cuts to get a fuller estimate.
Removal rate and tool life
Pushing the removal rate too high shortens tool life and can leave a poor finish or chatter marks. Many machinists rough at a high MRR to remove most of the stock quickly, then finish with lighter cuts at a lower MRR for accuracy and a good surface. The calculator helps you compare those passes and plan the time each will take.
Common mistakes
- Using spindle speed as feed. Feed rate is the linear speed of the cut.
- Mixing units. Use inches with inches per minute, or millimeters with mm per minute.
- Ignoring machine power. A high MRR needs enough power and rigidity.
- Counting only cutting time. Real cycle times include other moves.
Tips
- Start from the tool maker's recommended feeds and depths.
- Use MRR to compare roughing strategies.
- Check spindle load when pushing the rate up.
What next
Use this often? Add Material Rem to your Home screen.
Frequently asked questions
How does a material removal rate calculator work?
It multiplies the depth of cut by the width of cut and the feed rate to get the volume removed per minute.
What is the formula for material removal rate?
MRR = depth of cut × width of cut × feed rate.
What units is MRR measured in?
Usually cubic centimeters per minute, or cubic inches per minute in US units.
What is the MRR for a 0.1 × 0.5 inch cut at 20 in/min?
1 cubic inch per minute.
How do I find machining time from MRR?
Divide the volume to remove by the MRR.