A concrete column calculator finds how much concrete you need to fill round tube forms. Enter the diameter and height of one column, how many columns there are and a waste allowance. The calculator returns the volume in cubic yards, cubic metres and cubic feet, and the number of 40, 60 or 80 lb bags of premixed concrete.
How to use this concrete column calculator
- Choose US or metric units.
- Type the inside diameter of the tube form and the height of the column.
- Enter how many identical columns you are pouring.
- Set the waste allowance. Ten percent is a common starting point.
- Choose the bag size and press Calculate.
The formula
A round column is a cylinder, and its volume is pi times the radius squared times the height. [2] The radius is half the diameter. Multiply by the number of columns, then by one plus the waste percentage divided by 100. Convert the result to cubic feet and divide by the yield of the bag to count the bags, rounding up to a whole bag.
Bag yields
Bag yield is the volume of wet concrete one bag makes. The QUIKRETE Concrete Mix data sheet lists these approximate yields. [1] The calculator uses the three most common sizes.
| Bag weight | Approximate yield |
|---|---|
| 40 lb (18.1 kg) | 0.30 cubic feet (8.5 L) |
| 60 lb (27.2 kg) | 0.45 cubic feet (12.7 L) |
| 80 lb (36.2 kg) | 0.60 cubic feet (17 L) |
Other products and brands have different yields, so check the bag you buy. The yields above are for this particular mix. [1] If your bag is different, divide the cubic feet shown by the yield printed on your bag.
Worked example
You pour four columns in 12 inch tube forms, each 8 feet high. One column holds pi times 0.5 squared times 8, or about 6.28 cubic feet. Four columns hold 25.13 cubic feet. Add 10 percent waste to get 27.65 cubic feet, which is 1.02 cubic yards. With 80 lb bags at 0.60 cubic feet each you need 47 bags. With 60 lb bags you need 62 and with 40 lb bags you need 93.
Typical tube form sizes
Tube forms come in several diameters. As a rule of thumb, 8, 10 and 12 inch tubes are common for light posts and porch columns, while heavier loads use larger forms. A bigger diameter holds much more concrete because volume grows with the square of the radius. Doubling the diameter quadruples the concrete. Use the inside diameter of the tube, not the outside, because the wall of a cardboard tube has some thickness.
Why add a waste allowance
Concrete is lost in the mixer, the wheelbarrow and the spills, and a tube is rarely cut or filled to the exact line. Footings dug into the ground can also be a little wider than planned. A margin of 5 to 10 percent is a common rule of thumb, but we do not take it from a standard. Use a larger margin if the pour is awkward, and set it to zero if you want the exact volume.
Mixing and handling
A mixer needs room for the bags. The data sheet says to allow at least 1 cubic foot of mixer capacity for each 80 lb bag mixed at one time, and to add about 6 pints of water for each 80 lb bag. [1] Follow the instructions printed on the bag, because the water amount changes with the product. Pour and compact in layers so that air does not stay in the tube, and keep the form plumb while the concrete sets.
Metric example
In metric mode enter the diameter in centimetres and the height in metres. A single column 30 centimetres across and 2.4 metres high holds pi times 0.15 squared times 2.4, which is about 0.17 cubic metres. The calculator then converts to cubic feet to count bags, because bag yields are printed in cubic feet. If you buy bags with a printed metric yield, divide the volume in cubic metres by that yield instead.
Ready-mix or bags
Bags are practical for a few columns. At 27.65 cubic feet, the example above needs 47 bags of 80 lb, which is a lot of lifting. When the volume goes past roughly one cubic yard, compare the price of bags with a ready-mix delivery. A delivery company sells by the cubic yard, and many have a minimum load charge.
Planning the pour
Work out the delivery of bags before the day. Stack them close to the mixer, have clean water ready and line up helpers so each column is filled in one session. Pour from the top, tap the tube lightly and rod the concrete to remove air pockets. Wait before stripping the tube form, and follow the cure time on the bag.
Safety and structure
A column that carries a roof or deck is a structural part of the building. Its size, the steel inside it and the footing under it are set by a design and by your local building code. This calculator only counts concrete. It is not a structural design. Ask the building department or an engineer before you pour anything that holds weight.
Common mistakes
- Entering the outside diameter of the tube.
- Mixing inches and feet. Diameter is in inches and height is in feet in US mode.
- Forgetting to include the part of the column that sits in the footing.
- Using the yield of an 80 lb bag for a 60 lb bag.
- Buying exactly the calculated number of bags with no margin.
What next
Use this often? Add Concrete Col to your Home screen.
Frequently asked questions
How much concrete do I need for a 12 inch column 8 feet tall?
One column holds about 6.28 cubic feet before waste. Use this concrete column calculator to add the count of columns and a waste margin.
How does the concrete column calculator count bags?
It converts the volume to cubic feet and divides by the bag yield: about 0.60 for an 80 lb bag, 0.45 for 60 lb and 0.30 for 40 lb. It then rounds up to a whole bag.
Which diameter do I enter for a tube form?
Enter the inside diameter, since that is the width of the concrete.
Does the calculator include the footing?
No. Include the length of the column that goes into the footing in the height, or work out the footing separately with the footing calculator.
Can I use it for a structural column?
It only counts concrete. Structural size, steel and footings come from a design and local code.
Was this tool helpful?
What went wrong?
We only receive the reason you pick, never what you typed into the tool.
Thanks for your feedback.