A Gantt chart maker turns a plain list of tasks into a timeline that anyone can read at a glance. Type in each task, its start date and the number of days it takes, and this Gantt chart maker draws the bars, works out every end date, and tells you how long the whole project runs. You can leave a start date blank to make a task follow the one before it, which is the quickest way to plan a simple sequence of work. When you're happy, download the chart as a PNG for a slide or an email, or as an SVG for printing.
How to use the Gantt chart maker
- Name your project if you want a title on the chart.
- Add each task with a short name.
- Enter a start date for the first task, as MM/DD/YYYY or YYYY-MM-DD.
- Enter the number of days each task takes.
- Leave later start dates blank for tasks that follow on, or fill them in for tasks that overlap.
- Press Draw chart, then download the image.
What is a Gantt chart?
A Gantt chart is a bar chart that illustrates a project schedule. Tasks are listed on the vertical axis and time runs along the horizontal axis, and the width of each bar shows how long that activity lasts. The chart was designed and popularized by Henry Gantt around 1910 to 1915, although an earlier version called a harmonogram was developed by Karol Adamiecki in 1896. Today, Gantt charts are widely used in project planning, because they show the order of the work and the time it needs on a single page.
A worked example
Suppose that you are planning a small project with three stages. Research starts on 01/05/2026 and takes 5 days. Design has a blank start date and takes 4 days, and Build has a blank start date and takes 7 days. The tool places Research from January 5 to January 9, Design from January 10 to January 13, and Build from January 14 to January 20. The whole project takes 16 days, from January 5 to January 20, 2026.
How the dates are worked out
- End date = start date + days − 1, because the first day counts as a working day.
- A blank start date = the day after the previous task ends.
- Project length = the earliest start through to the latest end, including both days.
The tool counts calendar days, so weekends and holidays are included. If your team only works on weekdays, a task that takes five working days and crosses a weekend should be entered as seven days.
Sequential and overlapping tasks
Some work has to happen in order. You usually can't test a product until it has been built, for example. Those tasks suit a blank start date, because moving the first task or changing a duration automatically moves everything after it. Other work can happen at the same time, such as writing copy while the design is under way. For those, type a start date, and the bars will overlap on the chart. Where a task really depends on another, keep them in sequence, so the chart shows the true order of the work.
Tips for a useful project timeline
- Keep task names short. Names longer than 30 characters are shortened on the chart.
- Break large tasks down. A bar that covers half of the project tells people very little.
- Allow some slack. Most tasks take longer than the first estimate.
- Add review time. Approvals often take days, so they deserve a bar of their own.
- Share it early. A chart is most helpful while dates can still change.
When a Gantt chart helps most
A Gantt chart works well whenever a piece of work has several stages and a deadline. Teams use them for product launches, office moves, marketing campaigns, events, renovation work and school projects. A simple chart makes conversations easier, because everybody can see which task comes next and what a delay would affect. For large programs with hundreds of linked tasks, dedicated project management software is a better fit. This tool is designed for the much more common case in which you need a clear timeline quickly and don't want to set up an account.
PNG or SVG?
PNG is the easy choice for slides, documents and email, because it opens everywhere. SVG is a drawing format that stays sharp at any size, so it's a better option for printing a large poster or for further editing in a design program. Both downloads have a white background, so they look the same on any page. The chart is created on your own device and nothing about your project is sent to our server, so you can safely use it for confidential plans.
Updating your chart
Plans change, so keep your task list handy. Use the arrows to reorder tasks, the remove button to drop one, and press Draw chart again to refresh the timeline. Because blank start dates follow the task above them, reordering a sequence updates all of the dates automatically. Your tasks are not saved when you close the page, so finish and download your chart before you leave.
Common mistakes
- Forgetting the first start date. Every later task can be blank, but the first one can't.
- Counting weekends by accident. Add extra days if your team doesn't work them.
- Mixing up day and month. The short format is MM/DD/YYYY, so use YYYY-MM-DD if you prefer to avoid any doubt.
Related planning tools
Shift a deadline with add days to a date, measure a gap with the date difference calculator, and schedule your kickoff with the meeting planner.
What next
Use this often? Add Gantt Chart to your Home screen.
Frequently asked questions
How does the Gantt chart maker work?
You enter tasks, start dates and durations, and it draws a bar for each task on a shared timeline.
Do I need a start date for every task?
No. Only the first task needs one. A blank start date begins the day after the previous task ends.
Does it skip weekends?
No. It counts calendar days, so add extra days if your team doesn't work on weekends.
Can I download my chart?
Yes. You can download it as a PNG or an SVG file.
Is my project uploaded?
No. The chart is created in your browser.