High Low Method Calculator

Use this high low method calculator to find the variable cost per unit and the fixed cost from your highest and lowest activity periods, and estimate total cost.

Restored your last values ·

More options

From your records, pick the period with the highest activity and the period with the lowest, and enter the activity and total cost for each. Pick by activity, not by cost. Add an activity level to estimate its cost.

Everything is worked out in your browser. Nothing you type is sent anywhere.

–

–

Fill in the boxes and press Calculate.

See full result

A high low method calculator splits a mixed cost into its fixed and variable parts using just two data points: the period with the highest activity and the period with the lowest. Enter the activity level and total cost for each, and the calculator works out the variable cost per unit of activity, the fixed cost and the cost formula. Add another activity level to estimate what the total cost would be.

The high-low method formula

Variable cost per unit b = (cost at highest activity − cost at lowest activity) ÷ (highest activity − lowest activity)
Fixed cost = cost at highest activity − b × highest activity
Total cost = fixed cost + b × activity

OpenStax's managerial accounting text estimates the variable cost by dividing the difference between the costs of the high and low periods by the difference in activity, b = (Y1 − Y2) ÷ (X1 − X2), where Y1 and Y2 are the costs at the highest and lowest activity levels and X1 and X2 are the activity levels themselves. It then finds the fixed cost by taking the total cost at either the high or the low level of activity and subtracting the variable component. Both give the same fixed cost, because the line runs through both points.

How to use the high low method calculator

  1. Find the highest and lowest activity periods in your records.
  2. Enter the activity and total cost for the highest period.
  3. Enter the activity and total cost for the lowest period.
  4. Optionally enter an activity level to estimate its cost, and press Calculate.

Worked example

Take a hotel. Its busiest month had 4,545 guests and total costs of $371,225, and its quietest had 1,000 guests and $105,450. The variable cost per guest is (371,225 − 105,450) ÷ (4,545 − 1,000) = 265,775 ÷ 3,545, about $74.97. The fixed cost is about $30,478 a month, so the cost formula is roughly $30,478 + $74.97 per guest. For a month with 3,000 guests, the estimated cost is about $255,394. Rounding the variable cost to $74.97 and working from the low month gives a fixed cost of $30,480 and $255,390 for 3,000 guests; the small difference is rounding.

A second example

Here is a business whose costs were £10,600 in its busiest week, with 70 hours of work, and £8,500 in its quietest, with 40 hours. The variable cost is 2,100 ÷ 30 = £70 an hour. Working back from either week gives a fixed cost of £5,700: 10,600 − 70 × 70 and 8,500 − 70 × 40 both equal 5,700. A 60-hour week would then be expected to cost 5,700 + 70 × 60 = £9,900. The calculator gives the same figures when you enter those two weeks.

Picking the two points

OpenStax stresses that you always choose the highest and lowest activity and the costs that correspond with them, not the highest and lowest costs. The busiest period may not be the most expensive one if something unusual happened, and choosing by cost can pair the wrong months. Look for the highest and lowest values of the activity that drives the cost, such as units made, hours worked or guests served, and use the total costs recorded in those same periods.

Why use the high-low method

Many costs are partly fixed and partly variable. A utility bill has a standing charge plus a charge for what you use; a delivery business pays rent whatever its volume but fuel in proportion to its miles. Knowing how much of a cost is fixed and how much varies with activity helps with budgets, pricing and break-even analysis. The high-low method is the quickest way to make that split, because it needs only two numbers from your records and simple arithmetic. Once you have the split, the break-even calculator uses fixed costs and variable cost per unit to find the sales you need, and the contribution margin calculator shows what each sale contributes.

Limitations

OpenStax notes the method is not the most accurate way to predict future costs because it rests on only two pieces of cost data, so it ignores everything in between. If either the highest or the lowest period was unusual, for example because of a one-off repair or a price change, the line will be distorted. Methods that use every data point, such as fitting a line through all the periods, are usually more reliable when you have the data and the tools. The high-low method also assumes costs rise in a straight line with activity, which may not hold at very high or very low volumes. Treat estimates far outside the range between your two points with particular care.

Checking the result

Test the cost formula on a few other periods from your records. If the estimates come close to the actual costs, the split is reasonable. If they are far off, one of the two points may be unusual, or the cost may depend on more than one activity. A negative fixed cost is a sign that something is wrong with the data, since a business can't have negative fixed costs.

Common mistakes

  • Choosing the points by cost. Choose them by activity.
  • Mixing periods of different lengths. Compare months with months.
  • Using an unusual period. One-off costs distort the line.
  • Estimating far outside the range. The straight line may not hold there.

What next

Use this often? Add High Low Met to your Home screen.

Frequently asked questions

How does a high low method calculator work?

It divides the change in cost by the change in activity between the highest and lowest periods, then subtracts the variable part to find the fixed cost.

What is the variable cost in the hotel example?

About $74.97 per guest, with fixed costs of about $30,478 a month.

Should the high and low points be chosen by cost?

No. Choose them by activity level, as OpenStax stresses.

What is the formula for the variable cost per unit?

b = (Y1 − Y2) ÷ (X1 − X2), as in OpenStax's managerial accounting text.

What are the limits of the high-low method?

It uses only two points, so an unusual period can distort the result.